# Environmental Review Record - Piney Creek/Ridge Road & Fayetown Water Lateral Installation Project

- Summary: Document Overview This document is the cover page and table of contents for an Environmental Review Record regarding a water infrastructure project in Blair County, Pennsylvania. It outlines the…
- Source: Blair County
- Published: 
- Captured: 2026-08-10T16:49:35.826Z
- Source URL: https://www.blaircountypa.gov/getmedia/9606e091-6e38-4ae8-a559-9fb19ddb39ad/PineyCreek_Ridge_Road-Water-Lateral-(2).pdf
- Content URL: https://hollidaysburg.ebensburg.site/document/pineycreek-ridge-road-water-lateral-2/
- Content note: This portable copy is not the official record and may include an automated convenience summary. Verify important details in the original document.

Document Overview This document is the cover page and table of contents for an Environmental Review Record regarding a water infrastructure project in Blair County, Pennsylvania. It outlines the administrative and environmental compliance steps taken for a grant-funded initiative to install water laterals. Project Details Project Name: Piney Creek/Ridge Road & Fayetown Water Lateral Installation Project Location: Woodbury Township, Blair County Grant Number: CDBG FY2018 C000071558 Program: Community Development Block Grant (CDBG) Document Structure & Contents The record is organized into five main parts, covering the authorization of funds, citizen participation, project description, environmental assessment, and final determinations. Authorization & Citizen Participation Funds: Includes a Request for Release of Funds (RROF). Public Notice: Documents proof of public notification, including a Concurrent Notice (FONSI/RROF). Findings: Contains the Finding of No Significant Impact (FONSI) and the Request for Release of Funds. Project Description Activity Description: Referenced as form DCED-CDBG-007 (11-06). Visuals: Includes a location map and documentation of current conditions (pictures). Environmental Assessment This section details compliance with federal regulations (24 CFR 50. 4, 58. 5, and 58. 6). Compliance: Includes HUD worksheets and an Environmental Assessment Checklist. Mitigation: Lists mitigation measures and conditions required by 40 CFR 1505. 2 (c). Consultation & Determination Consultation: Records input from Local, State, and Federal Agencies, as well as a DEP PACT Review. Floodplain: Includes an 8-Step Floodplain Review and Decision-Making Process. Special Studies: A section for miscellaneous documentation is included in Part 5.
