application
HARB Application for Exterior Work — The Borough of Hollidaysburg
This is a blank application form used by residents or contractors to request approval for exterior modifications to properties within The Borough of Hollidaysburg, PA. It is administered by the Historic Architectural Review Board (HARB).
Key Details:
- Issuing Authority: The Borough of Hollidaysburg
- Address: 401 Blair Street, Hollidaysburg, PA 16648
- Website: www.hollidaysburgpa.org
- Phone/Fax/TTY numbers provided in header
I. Property Information
Required fields:
- Street Address
- Zoning Classification
II. Applicant Information
Fields to complete:
- Applicant Name, Address, Email, Phone
- Name and Address of Property Owner
- Owners Representative (if owner cannot attend HARB meeting)
Note: If an owner’s representative attends, they must have authority to commit the owner to approved changes.
III. Application Information
Application Type (check one or more):
- Remodeling
- New Construction
- Signage
- Demolition
- Addition
- Other (specify)
Attachments Required (check all that apply):
The HARB requires supporting materials for review. Submit any of the following:
- Elevations
- Site Plans
- Streetscape views
- Renderings
- Photographs
- Material Samples, Description, Specs.
Note: The HARB requires elevations, site plans, photographs, material samples, etc., for its review of the proposed work.
IV. Description of Proposed Work
A large text area for detailed description including:
- Exterior changes to be made
- Dimensions, placement, materials, colors
- How existing building elements will be changed or affected
V. Anticipated Project Timetable/Schedule
Space to outline project timeline.
⚠️ Important Deadline:
ALL APPLICATIONS ARE DUE BY NOON TWO WEEK’S PRIOR TO MEETING.
VI. Signatures
Signatures required from:
- Owner (with date)
- Applicant (with date)
VII. Staff Only (for internal use)
Fields filled by borough staff:
- Official Filing Date
- Application No.
- Meeting Date
This form must be submitted with all required attachments at least two weeks before the HARB meeting to ensure timely review. Residents should plan accordingly and allow time for revisions if needed.